Project Details
Finn Design Group (now merged with PASE) studied three different options for upgrading the existing O2 system: one option where the system would be enlarged in the same vicinity, and two options where a new system would be constructed at a
different location.
FDG presented the three options, and one option was selected for further study and preliminary design. It was also decided then to consider adding a bulk nitrogen system to the pad. Our preliminary design resulted in the following selection of equipment:
O2 System
- 20,000 Gal. Main Tank
- 6,000 Gal. Reserve Tank
- 23K SCFH Vaps (3)
- Switching Manifold
- Control Manifold
- Fill Assembly
N2 System
- 1,500 Main Tank
- 32-Cyl Reserve Manifold
- 5K SCFH Vaporizer
- Control Manifold
- Fill Assembly
FDG prepared a rough-order-ofmagnitude construction cost estimate for the system, retaining walls and pad, and prepared a concept drawing depicting the system, including 3D renderings created in Revit.