Project Details
The following new equipment was installed:
- Taylor Wharton VT-3000 Vertical Main Tank
- Chart VS-1500 Reserve Tank
- Cryoquip VAI 812-F Vaporizers (3)
- Eleet Timer/Diverter Manifold
- Eleet Hospital Control Manifold
- Eleet Hyperbaric Manifold
- Eleet Fill Station
Finn Design Group (now merged with PASE) prepared Structural and Mechanical Construction Documents for the system and coordinated the structural requirements for the concrete pad with the hospital Structural Engineer of Record. As part of our services, Finn Design Group also prepared a Revit model of the system.