BRIDGE PROJECT
PROJECT NAME AND LOCATION
Bernal Avenue Bridge
at the Arroyo de la Laguna
Pleasanton, California

SERVICES PERFORMED
Design Development
Construction Documents
Construction Administration (in progress)

Structural Design of New Single Span Bridge

This project included the design of a new single span, post-tensioned concrete bridge parallel to an existing steel truss bridge and retrofits and modifications to the existing steel truss bridge.

After the community commented on the aesthetic difference between the existing and new bridges, Peoples Associates designed a steel truss facade on top of the deck of the concrete bridge to match the apperance of the existing steel truss bridge.

Design modifications to the existing bridge included abutment underpinning, seismic enhancements, and a new cantilevered sidewalk.